Mill Road Bridge

A defining symbol of Mill Road

Introduction

The bridge has been selected for research for the Mill Road History Society mainly because it is the symbol of the railway, whose coming to Cambridge in 1845 can be said to have created Mill Road. From the very start, the crossing, which predated the bridge, brought changes to the lives of the people using what was then a country track; the various bridges whose history are outlined in the report did the same.

It is impossible to ignore the bridge on Mill Road; indeed, it is something of a defining landmark. It both divides the two wards of Romsey and Petersfield (often seen as very different in character) and also unites them. As such, it is a key part of the logo of the website www.mill-road.com created by the late Suzy Oakes, whose life is commemorated by a bench on the summit of the bridge.

Read the complete report on Mill Road Bridge (PDF)

Did you know?

Timeline

1845 – The Railway comes to Cambridge. Gt Eastern Railway lays tracks across Mill Road, then just a country track.
1846 (early) – Level Crossing and Gatekeepers Lodge built.
1889 – First Road bridge built.
1941 (30 January) – Bridge bombed during Second World War.
1980 – Current bridge built.
1985 – First mural.
1997 – Second mural.
2006 – Current mural.

Then and Now

Left ImageRight Image

The Level Crossing and Footbridge

Portion of 1886 OS Map. Courtesy of Cambridgeshire Archives croc.ma.XLVII.3.21.1888.1

When the railway came to Cambridge in July 1845 crowds of people flocked to places where the trains could be easily seen. One of those places was what was then a country track, Mill Road.

On Sunday, upon the Mill Road, there are sometimes between two and three hundred persons waiting to see the trains, including a large number of boys and girls, and despite the expostulations of the Company’s policeman, and another man, the people will keep crossing the line, immediately before the passing of the trains, in order that they may gain a better view of them.

CIP 13.09.1845

There were several near accidents and by September the town authorities stated ‘that it is absolutely necessary for the safety of the public that gates, closing on the railway, should be put across the Mill-road by the Great Eastern Railway Company and that a copy of this resolution be forwarded to the Secretary of the Company, by the Clerk of this Board’ CIP 06.09.1845. Whilst the level crossing gates were probably installed fairly quickly, it was over thirty years before Mill Road’s first bridge, a wooden footbridge was constructed over the tracks. It can be seen in the map above, as can the level crossing gates and the signal box. The gatekeepers house was near where Railway Cottages now stand.

The footbridge may have helped pedestrians, but Mill Road and its side streets were developing very rapidly on both sides of the track so there was an increasing amount of road traffic, horses and carts, cattle driven to and from market, carriages and so on. Pressure began to build for a road bridge.

The First Road Bridge 1889

Courtesy of the Cambridgeshire Collection, B.MILL.K1 7602

Even as the footbridge was being built there were voices calling for a proper road bridge as housing developed and traffic grew and as the railway needed to expand. A petition from Mr Coulson and friends (circa 1886/87) points out the delays and inconvenience caused by all who could not use the footbridge:

I. What caused me Thomas Coulson to write to the Newspaper was in consequence of a scene which I witnessed caused by Horses, Carts, Perambulators and some aged people waiting for the gate, when some huge Bullock were driven up amongst them and caused great [blank] to those who were waiting the full particulars of which I gave to the press at the time and I can detail a lot of evidence about the dangers I have seen…….
III. Mr Saint, Builder[,] says that he had seven horses and carts engaged carting over the line and from strict account he found that he had lost one shilling per diem by each horse and cart and one with the other seven shillings a day in addition to which the men had to wait and lose hire, all because of waiting at the Gate…..
VIII. Mr Negus detailed the wretched state of the wooden bridge quite spoiling the Ladies Dresses and at night it is quite a scandal through those who hang about the Bridge and it does not in any way meet the requirements of the District as there is now nearly two thousand who have to cross over the Structure or wait until the gate is open.

Planning and debate took many years and much controversy, especially when the Railway Company proposed an extraordinary scheme to divert Mill Road with the road swerving to the north just after Devonshire Road, and joining the existing road just before Argyle St.

Plan showing proposed diversion. Courtesy of Cambridgeshire Archives.

The ‘stump’ of Mill Road would have remained to allow access both to Gothic Cottage (still in existence) and to Mr Hedley’s ‘Eagle Foundry’ and his grand house The Limes, (now the site of the Depot) and the plan was probably proposed so that the Railway Company wasn’t forced into the expensive purchase of the Hedley property.

At the same time extensive changes were being debated about the Hills Road and Cherry Hinton Bridges. Eventually after the Parliamentary Hearing which was customary to settle disputes between local authorities and the railways, costs to both sides were assigned and final plans agreed with the line of the road unaltered.

The 1889 bridge (300 feet long, 30 feet wide with six arches on each side and decorative iron railings) was described by a Railway Spokesman as ‘the finest overhead bridge on the [Great Eastern Railway.]’ It must have been rather humiliating for the Mayor and other town dignitaries when the horse pulling their open carriage to the top of the bridge ‘refused to move. As the gentlemen in the carriage were in rather a dangerous position they at last stepped out and walked to witness the opening pf Tennison (sic) Road.’

Bombing of the Bridge January 1941

The 1889 bridge was indeed handsome and served Mill Road for many years, fortunately surviving the near miss of a stick of bombs dropped from a German Dornier bomber plane on January 31st 1941.

Scenes of the 1941 bombing. Courtesy of the Cambridgeshire Collection S1941 2685

One man on the bridge at the time, John Lake, of Thoday Street, was killed; the main damage to property was to Railway Cottages, but a huge hole was blown into the railings of the bridge on the north side, and many remember the large metal plate which covered the gap for many years.

[RS:] The houses were left derelict a long time and where the bomb went through the bridge, where there was all the railings all up the side, there was this big old cast-iron, metal plate bolted over it to stop the people going through it I suppose. It was there for ages. I wasn’t very old at the time. I don’t know how many years they left it like that.

Mill Road bridge c.1950

The 1980 Bridge

Throughout the 1960’s and 70’s British Rail carried out a nationwide programme of electrification, so it was clear to the city and county authorities that sooner or later the 1889 Mill Road Bridge would need to be demolished and a higher one built to accommodate the overhead electric cables. Again, the planning took many years and much debate (including arguments from ward councillors that separate provision should be made for cyclists). Eventually, in May 1980, building of the new bridge began alongside the old one, in an attempt to minimise disruption to road users.

The bridge from Great Eastern Street looking towards Petersfield. Courtesy of John Hullock and the Suzy Oakes Collection.

The final demolition of the old bridge took place over two days in November of that year.

Unlike the 1889 bridge, the design of the new bridge allowed for much graffiti and vandalism. For this reason, a mural was commissioned in June 1885 and designed and painted by students from Coleridge Community College. Their design ‘depict[ed] a night-and-day changing scene of Cambridge and Romsey and feature[d] some of the better-known buildings of the area’

Courtesy of Ann Horn and the Suzy Oakes Collection

A second mural followed in 1997, again designed by students from Coleridge Community College ‘in the style of the Spanish Surrealist painter Jean Miro’, and the current one was completed in 2006, featuring designs from the Castle Project and Youth Foyer.

You can read more about the murals and other public art in Cambridge in Monika Roskova’s MA dissertation.

 

Mill Road Bridge has been the starting point or the central point for many community events, from the protest ‘Reclaim the Streets’ of September 1996 to the handover of the Olympic Torch in July 2012. Every year, on the first Saturday of December during the annual Mill Road Winter Fair which sees the road closed to vehicles. Many hundreds of people enjoy a traffic-free walk over the bridge in a way that is reminiscent of those earlier residents of Mill Road who in 1845, also came to in their hundreds to the same spot to view the trains.

Mill Road Bridge

Mill Road Bridge 2021

View from Mill Road Bridge 2021

Read More


View from Mill Road bridge, 1963

 

Contribute

Do you have any information about the people or places in this article? If so, then please let us know using the Contact page or by emailing capturingcambridge@museumofcambridge.org.uk.

License

This work is licensed under CC BY-NC-SA 4.0

Dear Visitor,

 

Thank you for exploring historical Cambridgeshire! We hope you enjoy your visit.

 

Did you know that we are a small, independent Museum and that we rely on donations from people like you to survive?

 

If you love Capturing Cambridge, and you are able to, we’d appreciate your support today.

 

Every donation makes a world of difference.

 

Thank you,

The Museum of Cambridge